statistics
|
Road Details
|
ULB Roads(in Kms)
|
PWD(in Kms)
|
SH
|
|
Surface
|
Unsurfaced
|
Total
|
Surface
|
Total
10km
|
|
WBM
|
BT
|
CC
|
M
|
NM
|
WBM
|
BT
|
CC
|
| 18 |
30 |
08 |
15 |
71km |
- |
10km |
- |
| |
|
|
|
|
|
|
|
|
|
|
|
|
NOTE : WBM - Water Bound Macadum, BT - Block Topped, CC - Cement Concret, M - Motarable, NM - Non Motarable SH- State Highway
Solid Waste Management
|
|
Total Amount of SWG per day (in tons)
|
Total Amount of MSW Collected (in tons)
|
No of PDB
|
No of Vehicle for Transport and Disposal
|
Area of Land Fill Site (in Acres)
|
Percentage of Household Covered by Door-to-Door Collection
|
| 28 tons |
20 tons |
- |
Two tractors
Two tractor trailers
|
7.2acres
|
63.5%
|
| |
|
|
|
|
|
|
|
Street Light Details
|
Tube Light
|
Sodium Vapour lamps
|
Metal halide lamps
|
Others
|
Total
|
High mast installation
|
|
593
|
1354
|
-
|
-
|
1947
|
08
|
|
|